Protect the IP.
Prove the physics. Raise. Scale.
Six stages, run in sequence. The first three are underway; the remaining three unlock as the round closes. Stage completions and dated milestones land in the news feed.
File the provisional patent.
Draft the U.S. provisional for the Fe16N2 rotor + Fe4N stator substitution on the split-rotor multiphase generator architecture. Filed by Business Development LLC in Bill's name, joining the standing provisional cluster (ROSE-001, SonicBrief, XODIAK, Okari GX, UQCTA / QBC / MESH 34).
Filing establishes a priority date and enables the "patent pending" designation. The 12-month clock to non-provisional starts on the priority date and gets used to sharpen claims through bench trials in Stage 02.
Bench prototype (1 KW → 50 KW).
Build IN-1K through IN-50K units to prove the physics on a bench before committing to field-scale tooling. Bench trials narrow the ternary alloy recipe (Co / Mo / W ratios) and lock the segmentation pattern for the carbon-fiber compression sleeve.
- Two alternate Fe16N2 powder suppliers qualified beyond Niron Magnetics.
- Ternary alloy recipe optimized for (BH)max and Curie temperature.
- Segmented rotor stress-tested through 12,000 RPM in a spin pit.
- Fe4N stator core-loss measured at 100 kHz vs 0.35 mm silicon-steel baseline.
Business plan + seed round.
Package the physics, product ladder, PPA offering, and supply-chain story into a fundable business plan. Target seed check size and strategic LP mix: energy majors, data-center hyperscalers, defense primes, U.S. sovereign-adjacent LPs. Round pricing and lead-investor announcement will publish through the news feed.
Field units (100 KW → 1 MW).
Ship IN-100K through IN-1M as productized field units. Package IN-1M into a standard 20-ft container. Complete IEEE / UL / NFPA certification for the residential, commercial, and utility ratings. First fleet deployment pairs with an xELECTRICITYx data-center campus behind the meter.
Daisy-chain fleets + storage.
Add graphene and sodium-ion-graphene battery integration to the fleet SKUs. Pair generation with storage for the world's most efficient generation-plus-storage stack, at $5/W or PPA. First super-capacitor pilots for peak-shave loads. Explore data-center closed-loop with our ROSE photovoltaic platform.
Full ecosystem integration.
Iron Nitride units power our Enwatel water infrastructure, xSMARTLINKx connectivity nodes, our HALO longevity clinics (co-developed with Fountain Life and NanoRx), and drive-by-intel field programs. One clean, quiet, rare-earth-free box behind every load the country depends on.